The Floral Avenue grade separation between Cedar and Chestnut avenues in Fresno County is now open to traffic. (CHSRA)
Share
Getting your Trinity Audio player ready...
|
The California High-Speed Rail Authority announced the completion of two high-speed rail overcrossings in Fresno County on Monday.
The Mountain View Avenue and the Floral Avenue grade separations are open to traffic.
Construction began in 2023 on the structures built by contractor Dragados-Flatiron Joint Venture.
The Mountain View Avenue grade separation is between Cedar and Peach avenues.
Here’s a look at the Mountain View Avenue project by the numbers:
- 368 feet long
- 40 feet wide
- 1,600 cubic yards of concrete
- 4,000-plus pounds of steel
- 16 pre-cast concrete girders manufactured at the DFJV pre-cast facility in Hanford.
“Grade separations are important to ensure safety around the surrounding communities during future operations,” said Garth Fernandez, Central Valley Regional Director for CHSRA, in a news release. “They eliminate existing at-grade crossings, improving safety for vehicular traffic while also reducing traffic congestion and reducing greenhouse gas emissions from idling vehicles.”
Related Story: High-Speed Rail Now Working to Extend Valley Line to 171 Miles

The Floral Avenue grade separation is between Cedar and Chestnut avenues.
Here’s a look at the Floral Avenue project by the numbers:
- 381 feet long
- 40 feet wide
- 1,600 cubic yards concrete
- 4,000-plus pounds of steel
- 16 pre-cast concrete girders manufactured at the DFJV pre-cast facility.
Construction progresses daily on the high-speed rail project between Madera and Tulare counties, officials said. The authority has begun work to extend the 119 miles under construction to 171 miles of future electrified high-speed rail from Merced to Bakersfield.
There are more than 25 active construction sites in California’s Central Valley, with the authority having also fully environmentally cleared 422 miles of the high-speed rail program from the Bay Area to Los Angeles County.
For the latest on high-speed rail construction, visit this link.
Related Story: Get a 3D First Look at Merced’s High-Speed Rail Station Design
RELATED TOPICS:
Where Were the Most Car Crashes in Clovis? Police Release List
10 hours ago
Protesters to Rally in Brooklyn After Pro-Israel Crowd Assaults Woman
10 hours ago
Selma Teen’s Death May Be Tied to Fentanyl, Police Say
10 hours ago
Blast Kills at Least 26 People in Nigeria’s Northeast, Residents Say
11 hours ago
5-Year-Old Girl and Parents Among Those Dead in Vehicle Ramming in Vancouver
11 hours ago
Feds Again Bump Up Water Allocation for Many Fresno County Farmers
11 hours ago
Levi Strauss Shareholders Vote Against Proposal to End Diversity Programs
11 hours ago
Death Toll in Iran’s Bandar Abbas Port Blast Rises to 70
12 hours ago
Selma Mayor Responds to Criminal Charge
13 hours ago

Fresno County Farmer Sentenced to Prison in $650,000 Crop Insurance Fraud Case

Where Were the Most Car Crashes in Clovis? Police Release List

Protesters to Rally in Brooklyn After Pro-Israel Crowd Assaults Woman

Selma Teen’s Death May Be Tied to Fentanyl, Police Say

Blast Kills at Least 26 People in Nigeria’s Northeast, Residents Say

5-Year-Old Girl and Parents Among Those Dead in Vehicle Ramming in Vancouver

Wired Wednesday: What’s the Future of Fresno Unified and the Superintendent Position?

Zakaria Draws Parallels Between Trump’s Tariffs, Failed 1930s Economic Policies
